Six stages in a loop, one document trail

You always know what stage the project is at, what has been approved, and which document proves it.

01

Design

Kick-off meeting, design basis, then drawings issued to you for approval with a transmittal. You return each document with a status code.

HP1Design approval
02

Sourcing

Orders placed against the approved bill of materials. Material certificates are checked on arrival before anything is cut or welded.

HP2Material inspection
03

Fabrication

Built in our workshop to the inspection and test plan. The finished system runs on water at design conditions while your team watches.

HP3Factory acceptance test
04

Installation

Delivered with a delivery note and packing list, installed under permit-to-work, then walked down together to build the punch list.

HP4Mechanical completion
05

Commissioning

Start-up, site acceptance test and operator training. The handover certificate starts your warranty and lists anything still open.

HP5Handover
06

Lifecycle care

Your service agreement starts at handover: planned maintenance, spare parts held for your system and a 24/7 line for breakdowns. Each year we review the plant with you, and what we learn becomes the design basis for the next upgrade. The loop starts again at stage 01.

SAService agreement & annual review
Document control

Every document has a number and a revision

From the first quotation to every service report after handover, each document follows one format, so you can file our documents with your own and trace any revision.

MOR-QT-2611-0142 Rev 0

Company · document type · project · sequence · revision

CodeDocument
QT · OAQuotation, order acknowledgement
TR · DWGTransmittal, drawings
FAT · SATFactory and site acceptance test reports
PL · HCPunch list, handover certificate
SA · SRService agreement, service report